Egress window permits in Spokane: who to ask and what to bring

A new or enlarged basement window opening is a permit conversation. This guide compares the official pathways for four permit offices, then lists the inspection steps, the utility locate and the documents to have ready.

Plain-language summary of public pages, last checked October 14, 2026. Fees, review times and current forms are not covered: the permit office serving your address has the final word.

Get a Spokane egress window quote

Is a permit needed for an egress window?

The City of Spokane's window replacement policy says a building permit is required when the existing window and frame are removed and a new one is installed in the existing opening, or when the rough opening size changes. In a bedroom, a changed opening must meet current egress minimums. Replacing only the glass does not need a permit. Cutting a new opening in a foundation wall is a bigger change than either case, so describe it to the permit office before any cutting starts.

Say the room will be a bedroom

If the basement room will be used for sleeping, tell the permit office when you first call. The City's basement guide treats finishing a bedroom as a building permit and electrical permit job at a minimum, and says a basement bedroom is only a legal bedroom with an egress window or a door directly outside. Our bedroom checklist covers the City's other expectations.

Inspections: the applicant arranges them

The City says the permit applicant must request the needed inspections, including the final, and that work must stay accessible until approved. Its procedures sheet adds that the permit must be posted at the work, approved plans must be on site if the project needs them, the address must be visible from the street, and an adult 18 or older must be on site for the inspector. If a homeowner pulls the permit, the sheet says the applicant is responsible for the work and any corrections.

Utility locates come before digging

Washington law requires the excavator to outline the dig area in white and notify facility operators through the one-number locator service (811) at least two and no more than ten full business days before digging, and not to dig until a positive response has come from every operator with underground facilities in the area (rule effective January 1, 2026). Markings last 45 calendar days. The excavator stays responsible even if a contractor sends the notice, so ask who is making the call.

The permit pathway at a glance

Most egress projects follow the same order, even though each office has its own forms. Treat this as a conversation outline: your permit office and installer set the real sequence for your address.

Check the jurisdiction first
Six-step diagram: confirm the permit office, describe the whole project, apply with drawings, request utility locates before digging, request inspections, then final sign-off before finishing and using the room.
Diagram by Spokane Egress Windows based on City of Spokane and Spokane Valley pages and RCW 19.122.030. Simplified illustration; details vary by office.

Four permit pathways compared

On phones, each row is shown with its column labels.

Four permit pathways compared
ConsiderationCity of SpokaneSpokane CountySpokane ValleyAirway Heights
Where to startCity residential permit-process page, then the Egress Window Guide and Basement Remodel-Finish Guidelines it links.Permit portal jurisdiction map; the County FAQ says its online application covers unincorporated County, Millwood, Rockford and Spangle.Residential Building Permits page and the Permit Center.When Is a Permit Required page and the residential permit applications page.
What the official page says about windows or remodelsWindow Replacement Policy: a permit is needed when the window and frame are removed and a new one is set in the opening, or when the rough opening size changes. Glass-only replacement does not need one.Not verified for this guide. Ask Building & Planning whether a new or enlarged foundation opening needs a permit and what drawings it wants.Lists residential remodels, defined as interior alterations, among permitted projects. A standalone foundation cut is not specifically classified, so describe the whole scope.Lists doors, skylights and windows, and remodels that change the interior, such as converting basements into living space.
How to applyOnline Permitting portal or the DSC & Permit Center (City Hall).Online permit portal; ask Building & Planning about drawings for your scope.Online Permit Portal or PDF application; example site plans are provided.Email PDF submittals as separate files; phone photos and Google map site plans are not accepted.
Requesting inspectionsThe permit applicant requests them, including the final. Call the inspector listed on the permit before 8:30 a.m., or use an online account (contractors) for next-business-day scheduling.Not verified for this guide.Online Permit Portal or the Inspection Request Line; requests before 7 a.m. are generally done the same business day, later requests the next.Not described on the pages reviewed. Ask the Building Department.
Not verifiedWhether a basement opening may use the 5.0 sq ft figure; fees.Egress-specific triggers, fees and inspection steps.Fees; whether a sewer permit applies to your drainage proposal.Fees; inspection scheduling.

Documents and facts to have ready

From application to final, in order

  1. Confirm who issues the permit

    Use the City permit-process page and the county property tools it links.

  2. Apply with the right drawings

    Online where the office offers it; Airway Heights uses emailed PDFs and asks for payment of a plan review deposit before review starts.

  3. Arrange the utility locate

    Outline the dig area in white and notify the one-number locator service at least two full business days ahead; wait for operators to respond.

  4. Keep the work open for inspection

    Do not cover work that needs an inspection. If you are unsure which inspections apply, ask the inspector listed on the permit.

  5. Request the final

    The applicant requests it. Do not assume a final on one permit triggers inspections on another, such as an electrical permit.

  6. Finish the room after sign-off

    Ask the permit office what must be approved before the room is occupied.

Official sources

Reviewed 2026-10-14

Common questions

Does replacing a basement window in the City of Spokane need a permit?

It can. The City's window replacement policy requires a building permit when the window and frame are removed and a new one is installed, or when the rough opening size changes, but not when only the glass is replaced. If the opening in a bedroom changes, the new window must meet current egress minimums.

Who requests the inspections for an egress window permit?

In the City of Spokane the permit applicant must request the needed inspections, including the final, and keep the work accessible until it is approved. Spokane Valley accepts requests through its online portal or inspection line. Ask your installer whether they are the applicant.

How far ahead must utility locates be requested before digging a window well?

Washington law requires notice through the one-number locator service at least two and no more than ten full business days before excavation, with the dig area outlined in white. The excavator may not dig until every operator has given a positive response, and markings are valid for 45 calendar days.

What documents does a Spokane egress window permit application need?

It depends on the office and scope. The City's basement bedroom guide asks for a basement drawing with dimensions and a construction cost estimate, Spokane Valley offers example site plans, and Airway Heights wants emailed PDFs rather than phone photos. Ask your permit office for its current list.

Can a homeowner pull the permit for an egress window in Spokane?

The City's inspection procedures say some contractors ask homeowners to obtain permits, and that the permit applicant is then responsible for the work and any corrections. Ask the permit office whether homeowner permits are available for your scope and who would carry that responsibility.

Are the permit steps the same in Spokane Valley and Airway Heights?

No. Spokane Valley lists residential remodels as permitted work and offers an online portal. Airway Heights lists windows and basement conversions and takes emailed PDF submittals. Each city has its own forms, so use the table above to ask the right questions, not to assume the steps.